Tonight saw the assembly of the left elevator. I started by putting some red RTV (in case I fly really close to the sun or an active volcano) into the space between the elevator stiffeners (4 of them) to help minimize cracking, according to other builders and supposedly Van's. Although, I've not seen the RTV in the stiffener area referenced in any of the Van's documentation. It can't hurt putting the RTV in, so I did. However, I forgot to put it in on the right side!! Maybe I haven't combed through all the material enough. The reference to the red RTV and the sun is that the red RTV is for applications in the 300° category.
Until then, Take Care and Thanks For Reading!
Day Total: 2.3 hrs HOBBS Meter - 130.3 hrs