Sunday, September 2, 2012

Elevator Continued

Tonight's fun and frivolity consisted of scuffing the left elevator stiffeners, the E-615PP trim reinforcement plate and the left elevator skin, then cleaning and priming all these parts. There wasn't really much tonight. I used a Dremel-like tool, procured from the aviation aisle at Costco, to break some of the edges on the reinforcement plate. I'm not too thrilled with the results as the best thing it has to offer is a sanding drum, which I feel is a little too rough for cleaning edges on most pieces. I've seen where other builders will make their own tool for their Dremel tools using ScotchBrite material. Just get a bunch of ScotchBrite at Lowes, or Homer's if you prefer, then cut your pieces out and stack them together in whatever diameter size you desire, then attach them to one of the screw-shafts of your Dremel, using a little washer, so they don't disintegrate. Viola! You can make a number of these little gems for a few bucks compared to ordering them online. Yeah, it may take a little work, but we need to put our money toward other things on our project, right?
Scuffing up the Right Elevator Stiffeners
Right Elevator Parts Primed & Ready for Riveting
Right Elevator, Primed, Ready to Go!
Later, I'll be riveting the pieces that were primed tonight. I'll let them dry for now and have fun later. Take Care and Thanks For Reading!!
Day Total: 1.3 hrs   HOBBS Meter - 104.2 hrs

Saturday, September 1, 2012

Finish the Rudder, Begin the Elevator!

I am determined to keep this blog up to date! I've been a little busy with other things recently with vacations and such but I've still been slacking. It's been a month since my last construction post and that's not acceptable. My sincere apologies. Once I get behind, I develop the defeatist attitude and keep thinking, "Ugh, I have a lot to catch up on", then I procrastinate even further. Let's get caught up, shall we?

Rudder Skins - Continued:
Wednesday, August 1 - Tonight I installed the counterbalance into the R-913 CB rib. I didn't have to adjust the weight at all. I see where a lot of builders have had to shave the area around the rivets to make the weight fit in the rib between the rivets. I wonder if Van's is doing a better job of making sure there is less work to do in these kits as time goes on? So, I inserted the #10 screws and torqued the nuts to 20-25 in. lbs.

Counterbalance Installed with Little Fuss
I then cleco'd the rudder skins to the spar. NOTE: Make sure the rudder CB skin lays down FIRST, then the rudder skins lay down on top of that. Yes, it seems a little backwards. This is because the rudder skin leading edge will be on top of the CB skin and into the wind when completed. Well, not necessarily into the wind as it sits back from the leading edge in the taper of the rudder a bit and doesn't really catch the wind all that much. Besides, if you do it the other way, it just looks goofy. So, follow the plans very closely and you'll be fine.

First, rivet the 6 holes connecting the CB skin to the rudder skin. Then, rivet the 3 holes in the skin that attach to the spar. If you accidentally close this area with the rudder tip rib first, you'll either be drilling out the rivets or pulling rivets there and it won't look nice when finished. After you finish the 9 holes on each side, you'll then attach the tip rib then use 2 pull rivets here for the first time. There are only 2.
CB Skin in Place Under the Rudder Skin
Start With These 6 Rivets
Tip Rib in Place Covering the CB Weight
Using 2 Pull Rivets


Next, I riveted the skin to the spar. After I got done with that and ready to start the tip and root rivets, I looked at my rivet line and the shop heads looked very troublesome to me. They weren't sitting cleanly. I realized I was putting AN4263-4 rivets in and they were supposed to be AN4263-3.5 rivets!!! DANGIT! I set 96 rivets with 3-4s. Ok, I stopped here out of frustration. I'll drill them out, ALL OF THEM, tomorrow!
Notice the Rivets With a Bit of a Slant?
All of Them Are a Bit Too Long!
 Day Total: 2.0 hrs   HOBBS Meter - 86.9 hrs

Tursday, August 2 - Tonight, I drilled out and reset the 96 rivets connecting the rudder skins to the R-902 rudder spar. With that completed, I moved on to riveting the skins to the rest of the skeleton. I was struggling inside the rudder brace with 2 foreward-most rivets. I'll have to find the perfect bucking bar to reach that area or end up using pull rivets. I'd rather keep a clean profile. However, I know sometimes that's not possible. I'll give it a little more thought. I got one side done, attaching the rudder bottom strips. So, I still have more to complete riveting the skins before I get to working on the trailing edge.
Just a FEW of the Many That Were Drilled Out
and Replaced!
Ok, Back in Business. All Rivets Replaced
I'm going on a cruise to Alaska next week and I hope to have the trailing edge in the curing stage by then. I'll be gone 7 days which will allow plenty of time for it to cure without being disturbed. I'm stopping here as my eyelids feel like lead and I don't want to make any mistakes.
Day Total: 2.0 hrs   HOBBS Meter - 88.9 hrs
Friday, August 3 - I managed to get all the rivets in the horn brace squeezed and ended up pulling the last rivets on the bottom trailing edge and the last two on the tip trailing edge. It looks ugly now but a coat of paint when all is said and done will help pretty things up. Basically, I have everything prepared so I'll be ready to ProSeal the trailing edge tomorrow.
All Rivets in Rudder Brace Squeezed
Even the One That Looks Empty There

Rear-most Rivet on the Rudder Bottom
Rear-most Rivets on the Rudder Tip
Day Total: 3.1 hrs   HOBBS Meter - 92.0 hrs

Saturday, August 4 - On the workbench, I prepared the rudder on it's side. Then I laid out some adhesive plastic on the other bench and laid the AEX wedge on it. I used the small plunger-type ProSeal and prepared per the instructions on the package. Before this, I took care of roughing and cleaning all surfaces where ProSeal was to be applied. I made the mistake earlier of priming the entire insided surface of the rudder skins. I should have masked off the area where the ProSeal would be applied. Oh well, I'll catch that on the NEXT airplane! Yeah, Right!!! So, I cleaned up the primer from the trailing edge location with acetone and scuffed the area with a ScotchBrite pad then cleaned everything twice with denatured alcohol. Follow the plans regarding tank cleaning preparation steps in Section 7, per the plans! Not just clean, CLEAN!

So, everything is clean, the ProSeal is mixed and put in the caulking gun. YES! You need a caulking gun to squeeze the epoxy from the tube. Make sure you have one BEFORE you mix or you'll be grabbing a screwdriver last minute and pushing it up in the tube, which is cumbersome, but can be done. A caulking gun will make things much easier. So, with the AEX wedge laying on my plastic (basically this is carpet cover used for painting), I squeezed some epoxy all the way down one side of the wedge then took a popcicle stick (a.k.a. craft stick, found in your local Walmart or any craft store) and used it as a squeegee and laid the bead to a thin layer. I then picked up the wedge and laid that side down in the rudder. I had previously inserted 1" blocks to separate the skins with a 2x4 block in the center. This is only temporary while you are inserting the AEX wedge. I made sure to spread the epoxy on the side  of the wedge to be laid down in the rudder. After placing it, I then squeezed a bead on the now, up side and repeated the popcicle method. After the wedge was covered with epoxy, I applied some red RTV on the rivets of the trailing end of one side of the rudder stiffeners. I've seen this on other builders' sites and figured it couldn't hurt. It's to minimize vibrations of one surface against another. Then, I pulled all skin spreading blocks out and squeezed the skins together, wiping off all excess ProSeal. I put 2 pieces of angle aluminum on and put a cleco in every other hole on one side then cleco'd the rest of the holes on the other side. I tried to clean any other oozing. I set the rudder on its leading edge with the trailing edge pointed to the ceiling on a couple blocks where the rod bearings will be inserted. Then I put a couple clamps on either side of the rudder to prevent the rudder from falling one way or another. We live in earthquake country and all it takes is a little tremor for it to make its way off the workbench. Now, I'm off to Alaska on a cruise for a week. This ought to be plenty of time to allow the ProSeal to cure.
AEX Wedge in Place With ProSeal
Cleco'd with Aluminum Angles
Okay, Now Wait for a Week!
Day Total: 1.1 hrs   HOBBS Meter - 93.0 hrs
Monday, August 13 - Today, I removed the clecos and angles to reveal what 7 days of curing did with Misty's rudder. WOW, very straight! It looks really nice. I took and X-Acto knife with a #11 blade and carefully cleaned all the holes of ProSeal to get them nice and clean. Then I took Q-Tips and denatured alcohol and cleaned the rivet seat of the hole to make sure everything was very clean so a rivet would sit nicely into each one with no issues. I didn't add this time to the build as I felt it wasn't necessarily building and was more cleaning up residual "spill over". I put rivets in a cup with denatured alcolhol to clean them and get any manufacturing goo or gunk off them, per the Section 7 instructions. I'm sure this isn't necessary here as the Section 7 information on cleaning is targeting the cleaning preparation that'd done on the fuel tanks and THAT's where you want the rivets to be extra clean as they'll be coverd with ProSeal. I then put all rivets in the trailing edge and taped them off for the preparation of riveting, which will be tomorrow. 
Day Total: 0.0 hrs   HOBBS Meter - 93.0 hrs
Tuesday, August 14 - Tonight I set 46 rivets in the trailing edge of Misty's rudder. I started by half-setting every 10th rivet then going back and half setting every fifth then back and continuing every fifth until they were all fully set. After that, I drilled out one rivet that was sitting a little proud. I reset that one, then flipped the rudder over and used a mushroom set to finish setting them all. Everything looks good with very minor deviation in a couple spots. It looks like they're less than the maximum .10" allowance. Next, rolling the leading edge!
Manufactured Side, Rivets Set
Shop Head Side, Everything Set Very Nicely
I don't remember which day I did this but I didn't log my notes so I'll try to fill in the blanks here. It was a difficult challenge, but I managed to get the edge rolled. I went to Lowes to get a 3/4" pipe for rolling, per the plans. I started by using duct tape and starting first with the side that has a 90° bend, which will end up on the inside of the two skins after they're brought together. I followed the plans pretty well, keeping pressure down on the pipe, against the skin, while rolling. I did all three sections as one roll. I've read where people will do a section at a time to have better control. This also lessens the amount of force needed to make the roll. After having done this, it's my obvservation that the plans aren't accurate enough to accomplish this task cleanly and reading other's blogs helps. However, I tried to be a true Van's plans follower and was left a little disappointed. In the plans, there are two places that call out information as to exactly what to do. Now, this may vary because the preview plans used are for all builders. That said, I think the plans are generic in nature and not all rolled edges are alike. So, in the preview plans and information area, they have you use a larger 1" pipe and in the build plans, they have you use a 3/4" pipe. I know from reading other blogs that all builders have to mess and tweek the roll a little to get the two sides to meet up correctly. Expect this. You have to start clecoing the sides together, use duct tape, and everything in the world to get these two sides together. If you're doing this yourself with no help, it will be a challenge. It takes quite a bit of hand strength to bring the edges together. I'm sure with practice on many rolled edges, this will get better and easier with time. Take a deep breath and go slow. Once you have everything cleco'd together, you need to match-drill. No problem. Now, you need to debur and clean. Yeah, right. Now, you can either pull all your clecos and do your best to get behind the impossibly reachable area then try to get everything cleco'd back together again. Or, you can do what everyone else does and clean as much as you can with things cleco'd in place. I used a little deburr tool that fits in the #40 holes and lightly cleaned everything I could and used fingers to feel all the holes  reachable on the inside for any burrs. Because this is not a stress area and the sides are only being brought together to keep them from flapping in the wind, it seems that this is not really that big a deal. Next, I used pull rivets on all the holes. I had a little concern that when I had the line of holes cleco'd, the line wasn't trully straight from tip to bottom. My line had a slight curve to it. I haven't seen anyone else mention this but I haven't read everyone's blog either. No worries. The rudder looks straight and it might be just because of the length of skins from trailing edge to leading edge. I didn't measure beforehand, but why would I? After all the rivets were pulled, the rudder looked great!
The Start of Rolling the Rudder's Leading Edge
After that, I made a cool little tool that I picked up from another builder's site. It's for installing the rod bearing. It's pretty simple. You only need a couple feed of 3/4" PVC water pipe, 2 end caps, 1 T-piece and a slip joint. Here are some pictures to help you. Make sure you line up the slot at the end of your tool with the handle, making it easier to know where your bearing angle is.
Here Are All Your Parts, Use Standard PVC
Joint Cleaner & Cement
The Parts Dry-Fit Together. The Slip-Joint
Shown at the End Will Be Cut in Half.
Only Half Will Be Used to be Flush at the End
All Glued Together with Rod Bearing Entering
Rod Bearing Completely in Showing Fit
Rod Bearing Tool On & In Place. Nice Huh?
Close-Up View of Tool in Place
 THE RUDDER IS DONE, except of course for the fiberglass tip. Moving on.
Day Total: 0.8 hrs   HOBBS Meter - 93.8 hrs
Starting the Elevator
Wednesday, August 22 - Tonight I prepped the elevator stiffeners by pulling off all the blue vinyl and marking all the parts with their part numbers. I marked the cut marks on one stiffener to make sure I had the markings right.
Pulling the Blue Vinyl Is Fun!
All the Elevator Stiffeners, Marked & Ready
to be Cut
Closer View of Part ID & Cut Marks
Day Total: 0.6 hrs   HOBBS Meter - 94.4 hrs
Friday, August 24 - I finished marking the rest of the stiffeners with their cut marks then proceeded to cut with my metal cutters, then I edged-cleaned all of them on the ScotchBrite wheel. No pictures tonight.
Day Total: 2.3 hrs   HOBBS Meter - 96.7 hrs
Sunday, August 26 - Tonight, I officially started on the right elevator by clecoing all the stiffeners to the right elevator skin then match-drilling. I removed all stiffeners then deburred them as well as the right skin. Then, I dimpled the skin and all stiffeners for the right side. Next will be setting rivets for the stiffeners and bending the elevator skin. I have the parts but need to make the suggested bending brake per the plans.
Right Elevator Stiffeners All Prepared &
Ready for Priming
 
Right Elevator Skin Dimpled Ready for Priming
Day Total: 2.3 hrs   HOBBS Meter - 99.0 hrs
Monday, August 27 - I scuffed, cleaned and primed the right elevator skin and stiffeners.
Stiffeners Primed& Drying 
Right Elevator Skin Primed & Drying
Day Total: 1.3 hrs HOBBS Meter - 100.3 hrs
Tuesday, August 28 - Today, I riveted all the previously prepared stiffeners for the right elevator and skin, E-701R. I stopped here to get ready to make the bending brake needed to bend the elevators and the elevator trim tab per the Van's plans. I've seen where people will put a 1/8" wooden dowel rod in the skin bend to keep the skin from bending too much at that point. I'm considering using a dowel as well as separating the boards of my bending brake by 1/8" to enable a good bend without putting too much pressure on the curve where the rod would go and more pressure past that point to the leading edge. I've also seen where builders had a problem with not being able to bend far enough with the dowl rod in place. With the space between the boards of my brake, I should be able to get the bend of the elevators to a point that won't require much, if any, fiddling. I'm also concerned a little with another builder issue that I've seen where the 1/8" dowel was too small when they bent their parts. I may get a couple of sizes and play with it a bit to see how it goes.
Right Elevator & Stiffeners All Riveted
Awaiting the Big Bend! LOL
Day Total: 1.0 hrs   HOBBS Meter - 101.3 hrs
Wednesday, August 29 - So, today I made the bending brake per the plans for bending the elevators and the trim tab. I cut a 2"x6"x8' board into to pieces, making one piece 46" which left the other piece 50". This will make one a little longer, giving me a handle to grab while it's on the bench. I bought 2 packages of 3"x1" brass hinges (4 total). It doesn't matter what kind of hinge it is, brass, steel, etc. I happened to find some on sale for a couple bucks a set. I put wedges between the boards at a gap of 1/8" then installed the hinges. I figure having the 1/8" gap keeps you from mashing the trailing edge of the skins. Plus, you can't really bend the skins that far anyway because of the stiffeners inside preventing the skins going to far. However, it seems to me if the space between the boards is not there to begin with and you don't use a dowel in there, you run the risk of maybe bending or creasing the radius of the trailing edge too far. I did not use a dowel as I didn't want to make a trip to the store for just a piece of dowling, plus, it's not called out in the plans. I put my elevator in the brake and with steady pressure, I pressed down in the middle then on the ends and then up and down a few times and VIOLA! I think it looks pretty good. I put a straightedge on the skin and it looks pretty good to me. I'll look closer and make sure a little more tweaking isn't necessary. I can always pull the skin out a bit to where the stiffeners are outside of the brake area and apply a little more pressure, if needed.
The Bending Brake Completed
This Shows the 1/8" Gap I Added In

The Bending Brake Ready For its First Victim
This Worked Out Pretty Well. Nice & Easy
After the right elevator bending, I proceeded to get the left skin and stiffeners cleco'd as well as match-drilled. The E-615PP trim access reinforcement plate was in this little process as well. I've deburred all the left elevator stiffeners and the E-615PP plate and the inside of the left side elevator skin. I still need to "break" the edges of the skin and the E-615PP plate. I stopped here as I need to remove the blue vinyl from the riveted holes on the outter area of the skin and I just wasn't up to the task of plugging in the soldering iron to get it heated. I'll attack this on Friday, my day off of a long, 4-day, Labor Day weekend!  Take Care and Thanks For Reading!!!
Day Total: 1.6 hrs   HOBBS Meter - 102.9 hrs

Saturday, July 28, 2012

Rudder, Continued

As I said  I was going to do earlier, I pulled the rudder counterbalance (CB) skin off and tried to tweak a few things, mainly the ribs, to get the holes to line up a little better than they were. I finally succeeded with that.
Working with the CB Skin Ribs to Get a Better Fit
So, once I had things back together, I match drilled the skin to the rib holes with a #40. Next up was to cleco the rudder skins to the ribs and spar assembly. Also, make sure you file the area of the split of the rudder skin to fit around the rudder horn. This isn't called out anywhere but just assumed. I made sure to have at least a 1/32"-1/16" gap on either side.
Rudder Skins Attached, Ready for #40 Drilling
Fitting the Skin to Fit Around the Rudder Horn
After that, I inserted the AEX R-916 rudder trailing edge between the skins and cleco'd in place then drilled all the holes in the rudder to size. Make sure you have your AEX piece in place the correct way. I've seen where builders have put it in place with the "V" facing AFT, only to realize it's in backward after drilling. Next, I marked, cut and trimmed the R-710 rudder brace. You have to cut off a bit on both sides of the piece for it to fit in the bottom spar.
Rudder Brace - Cut, Cleaned and Ready To Go!
Once cut and cleaned, I inserted it between the R-405 PD rudder horn and the R-904 bottom spar. Cleco it in place and then first match drill the aft holes to #30 then move to the forward holes and match drill.
Rudder Horn In Place, Ready for Match Drilling
I then took a 36" piece of  .032 aluminum from the parts inventory and cut it into 2 pieces and fabricated the R-918 rudder bottom attachment strips per the plans and drawing. They have you clamp the pieces in place and measure on your own as to where it should be attaced. I made sure mainly to keep the aft hole in from the end of the pieces by 1/4" so you have enough edge spacing for your rivets to set correctly. I also made sure to not run the strip into the bend of the rib flange. That said, my measurement came to be 9/16" from the bottom of the skin to the bottom of the strip and 1/4" from the aft end of the strip to the aft edge of the last hole in the skin. Confused? It's pretty easy. I can clarify in an e-mail if you'd like. The third picture better illustrates the discussion.
Rudder Bottom Attachment Strips
Attachment Strips After Clamping. Drill As You
Go, Inserting Clecos Along the Way.

Rudder Attachment Strip Marked 1/4" from end
Once the strips are in place, I match drilled to a #40 then disassembled the whole kit and kaboodle. Deburr all the holes then dimple the skin, spar and ribs. I haven't done any dimpling as I'm still deburring and cleaning edges. Oh, the plans don't mention anywhere to match drill the reinforcement plates. While disassemblilng, I realized this and took care of that with a #30 before removing the clecos.
Spar Reinforcement Plates - Don't Forget to
Match Drill Before Disassembly


Rudder Disassembled - Ready for Deburr,
Edging Breaking, ScotchBrite and Cleaning
Lather, Rinse Repeat.....
 Sunday, July 22 - 4.6 hrs
HOBBS Meter - 76.3 hrs

Tonight I finished deburring. Wednesday, July 25 - .5 hrs

Thursday, July 26 - Tonight, I started dimpling and edge cleaning all parts. I haven't dimpled the rudder skins yet, except for the CB skin. I stopped when I got to the tip rib where I don't have the correct tools to dimple the last few holes. I've read where most builders get stuck here. I ordered a set of 3/32" dimple dies from Avery on a set of Vice Grips. That seems to be the way to go after quite a bit of research. You'll have to bend the flanges out of the way a bit to get to them cleanly then bend them back. Only slightly so as not to create fatigue in that area. Their inventory shows "Out Of Stock". In the meantime, I'll finish dimpling the skins and maybe move on to the next sub-assembly. I do have some rearranging in the garage to tackle so I can get my wing parts out of their crates and up on shelving units. In addition, I need to get ready to build the wing jigs which will mount from the floor to the ceiling and extend from near the rollup door back to a little longer than the length of the wings. That'll be a fun little project. That's it for now. Take Care and Thanks For Reading!
HOBBS Meter - 77.4 hrs.

Saturday, June 16, 2012

Back On Track - Mostly

I left off with the comment that I was going to build the Van's Tool Box project to get back up to speed with riveting. I completed that project and I'm glad I did as I was pretty rusty with my riveting skills. I needed to get the hang of it and get the setting right with the rivet gun. I worked with several riveting techniques including using the pneumatic rivet squeezer (I love this one), bucking by using and getting familiar with all the bars in the tool kit including a tungsten bar, and rivet sets, one being the tight fit (spring loaded) rivet set. I had to send this little gem back because the mechanism was sticking. I'm still waiting for that to come back from Isham, along with my inch-pound torque wrench. The little ball bearing that holds a socket on popped out along with the little, teeny weeny spring. I couldn't get it to stay back in so I sent that back as well.
The Van's Took Box Project - Parts All Layed Out
Tool Box Project - Bottom Riveted and Top Cleco'd
All Complete! Read Directions Very Carefully,
Meaning Read Ahead Sometimes.
It'll Save Some Headache Later.

Sending the Torque Wrench & Tight Fit Rivet Set
Back for Repair or Replacement.

Thurs, May 31 - So, after the tool box was finished, I resumed the HS construction by attaching HS-708 to the rear spar assembly. I Cleco'd the HS-412PP and HS-413PP elevator hinge brackets to the rear spar assembly and match drilled them per the plans. I assembled the elevator hing assembly bracket together and match drilled it as well. I stopped her for the night.

Token Builder Picture
Working the HS Rear Spar Assembly
The VA-146 Hinge Bearing Being Primed
Ok, speaking of priming, I'll give a little dissertation on priming. This is what I researched, discovered and went with. I did a lot of research, what's best, rattle can or 2-part epoxy. I looked at a lot of builder sites as well as EAA forums and VAF. Then I checked my notes and I remembered what Jack Dueck said during the EAA RV Builders Workshop. He's built and flys an RV-4. Here is Jack's take on corrosion protection. Here is a little Bio on Jack and his activities at AirVenture 2012. He's a BIG proponet of rattle-can primers, very easy, effective and no cleanup!

I live in the arid, Antelope Valley in the Mojave Desert of Southern California. It's pretty dry here. I could probably go the route of the GA manufacturers and not prime inside. However, I figure using a rattle-can, self-etching primer is still better than no coat at all and if, down the line, I decide to sell my baby, anybody intetested in having a plane with internal protection will still have that benefit. That said, I'm going with SEM Self-Etching primer. It's a bit costly at $18+ a can. But I understand that I'll be using approximatly a dozen cans for the project. I thought of getting more but the shelf life of the product is only a year so I'll get what I need when I need it. I tried the Rust-O-Leum brand and was disappointed with how it turned out after drying. It dries pretty quickly, is a little heavy when it goes on and a little rough after drying. I tried the SEM on a sample piece of aluminum and was really pleased with the fingernail scratch test. I'm sold. The picture above is of the Rust-O-Leum brand. You'll see pictures later of the SEM brand. I sent an e-mail to Jack confirming the preparation for a project for priming. I inquired about Alumiprep, et al, and Alodine and this is what Jack had to say: "Yes, alumniprep and alodine is overkill.  All you need to do is clean the part with acetone or mek and then spray it with the self etching primer.  Protect yourself during the cleaning process with latex or rubber gloves.  You'll have good results and good corrosion protection.". I understand that even with priming in this manner, you'd be adding between 5 and 10 pounds of weight over all. I can settle for that.

I finished with all the other little projects in the garage, installing the air compressor, air lines, air hose reel, and a little space rearrangement. I pulled the manufacturer drain from the bottom of the air compressor and installed an elbow and extended out a line with a ball valve inline which will be much easier to drain than reaching under to get  to that little 1/4" screw valve. I also installed a RapidAir system for delivering air through the shop. I put a chuck on a manifold near the compressor. The manifold then runs up the wall to the ceiling where it goes in two directions, one to the air hose reel installed on the ceiling and one back to the built in bench/cabinets on the back wall of my garage. I'll have air in 3 convenient locations! ;o) Rapid Air makes a really nice, very simple and easy-to-install system. For $100 and free shipping from various vendors, I highly recommend it! I also installed a 20" fan in the garage to MOVE the still hot air. A breeze is better that nothin'!
HOBBS Meter - 6.5 hrs

RapidAir System Mounted Behind Compressor
Air Hose Reel Ceiling
Mounted & Connected to RapidAir System
End Unit with Chuck for Air at the Workbench
Here is the RapidAir Kit. An Excellent Product!
Aaahhhh, What a Breeze!
Fan From NorthernTool.com
Sat, June 2 - So, let's get back to work. Garage finalized, tool box completed, Let's resume, shall we? I completed the elevator hinge bracket/bearing assembly by riveting the first rivets of the project! I had to drill out the first 2 rivets (successfully I might add) as I didn't apply enough pressure on the manufacturing head which resulted with rivets sitting proud (not seated fully) by about 1/16". I completed riveting then Cleco'd the assembly to the rear HS spar and enlarged the #30 holes to a #12, per the plans.
HOBBS Meter - 7.7 hrs

HS Rear Spar Hinge Bracket Assembly.
Perty Huh? :o)

Tues, June 12 - I marked the HS rear spar parts, disassembled them then started on the HS front spar assembly. I Cleco'd the HS-710 and HS-714 reinforcement angles to the front spar (HS-702) then match drilled per view A-A on the plans.
HOBBS Meter - 9.3 hrs

HS-702 Front Spar with HS-712 & HS714
Cleco'd & Match Drilled
Wed, June 13 - I removed the angles from the front spar and measured and marked them up, cut and filed the ends then added a 6° bend per the plans. This seems like a really slow process with the amount of time spent on this little section. However, I'm taking them to "measure twice, cut once!". I'm just getting ready ready to cut back the HS-702 front spar pieces as these parts are used for and RV-8 and more material needs to be cut away to work for a -7. So, I've marked them up a bit but am going to stop here to give this some thought as to how I'll cut them, i.e., using snips or band saw then clean up. I'm always leary of snips and getting aluminum stuck between the blades and not cutting the part cleanly. However, these are brand new snips and have a really nice edge! I like the bandsaw for cuts but it's limited to the flexibility of the parts movement on the table. I'll sleep on this.
HOBBS Meter - 11.1 hrs

Thurs, June 14, Flag Day! - I worked on the HS-702 front spar. I made the measurements and cut the flanges back per the plans. NOTE TO NEW BUILDERS: READ AHEAD IN THE DIRECTIONS! I didn't read far enough ahead and ASSUMED I had to read the blueprint to follow what was being called out to be trimmed, cut, bent, etc. READ AHEAD A LITTLE TO MAKE SURE YOU'RE DOING EVERYTHING GIVEN TO YOU! If you don't understand what I'm saying here, e-mail me, I'll go into more detail. After all the cuts and everything, the spar parts don't look bad, having not followed the plans and "winging" it. They could be a little cleaner from the aspect of the flanges not being bent out cleanly enough. I thought I had a crack where I had to make the notch relief but after a little filing, it turned out to be ok. After a little more cleanup and priming, they'll probably turn out pretty nice. Next is dimpling the front spar pieces and countersinking the angle parts. I want to be fresh for those steps, particularly countersinking. I will do a little testing before the actual deed to make sure my skills are up to the task. It's been a while since the workshop performing this task as well and it's a new CS cage to get used to.

Marked and Trimming the HS-710 & HS-714 Angles
Now a Little Cleanup

All Pretty Except for a Little ScotchBrite Touchup

After Bends, Cleco'd & Ready for CS & Dimpling
I'm off for Boston tomorrow (Sunday) for a week. My wife has a training seminar there and we're taking the week before her training to do a little sightseeing. I've never been and am really looking forward to the trip for the history and other things the city has to offer.

This post has been a bit long-winded as I'm trying to catch up. I'll try not to get so behind between posts. Once again, Take Care and Thanks for Reading!
HOBBS Meter - 12.6 hrs